Global Consumer Electronics Manufacturer: VMI Transformation — 30 to 2 Days of Inventory
The Challenge
A global consumer electronics and automotive components manufacturer with 3 North American divisions was running a 200,000 sq ft raw materials warehouse that was unmanned, unlabeled, and unsupervised. Inventory sat at 30 days on hand, yet stock-outs were constant.
Nothing was collocated, locations were not identified, there was no cycle counting, and ERP inventories were wildly inaccurate. Materials already in the building were re-purchased because no one could find them.
Our Approach
The facility was staffed and supervised, racked, and RFID-labeled; materials were collocated by product family; and a Plan For Every Part and material maps made any component findable within minutes.
Cycle counting was implemented and sustained, visual management assigned accountability, and a formal pull system between the plant and the distribution facility replaced ad-hoc truck runs.
Vendor-managed inventory programs were negotiated with key suppliers, and standard work was established for every process in the facility.
Measurable Results
- Inventory reduced from 30 Days on Hand to 2 DOH — a 93% reduction
- Stock-outs eliminated through a pull system between plant and distribution facility
- Cycle count accuracy achieved and sustained at 99.9%
- $42K annual savings in warehouse and manufacturing supplies through sourcing and negotiation
- 5S layout and pull processes established across a distribution facility feeding 3 NA divisions
- Facility transformed from unmanned chaos to a model distribution operation
“We went from a warehouse where no one could find anything — so they just bought more — to a facility running at 99.9% cycle count accuracy with 2 days of inventory. The pull system ended stock-outs entirely.”
Facing something similar?
More Client Results
OEM Machinery Kanban Transformation
Facility-wide Kanban, PFEP across 43,000 SKUs, and RFID pull systems took a $88M-spend OEM from daily line shutdowns to under 10 shortages and 25 inventory turns.
Read the case study OEM Heavy Machinery — Pacific Northwest to Southeast USCross-Country Product Line Relocation
A 3P stage-gate relocation resourced 7,900 components to a new Southeast supply base in 5 months while keeping current production running and launching 3 new products.
Read the case study Tier 1 Automotive (TS16949) — Midwest USTier 1 Automotive Inventory Recovery
Facility-wide Kanban, first-time cycle counting, and a logistics redesign recovered $13.8M in inventory for a Tier 1 automotive plastics manufacturer while sustaining 100% OTD.