Defense Armor Manufacturer: Supply Chain Ethics Overhaul & 97% OTD Recovery
The Challenge
A defense armor manufacturer operating 4 facilities with $28M in annual procurement spend was in crisis. On-time delivery to military customers was below 50%, and three DCMA government quality representatives were stationed full-time at the facility because of chronic late deliveries.
The root cause ran deeper than scheduling: purchase orders were concentrated with a few favored, capacity-constrained suppliers who batch-produced far more than the BOM called for, creating constant shortages. Indirect material spending in the tool room was $65,800/month with no controls.
Our Approach
After the findings were presented to the owner, the compromised purchasing relationship was ended. The machining supply base was expanded from 6 to 12 suppliers to remove capacity bottlenecks, and purchase orders were restructured to require complete kits matching BOM quantities.
Pull systems were established for raw materials, components, and indirect supplies; formal purchasing, sourcing, planning, and shipping/receiving processes were created; and scorecards were built across all 4 sites.
Kanban and weekly spend reviews brought tool-room spending under control, and a multi-facility ERP integration improved procurement, logistics, and planning.
Measurable Results
- $425K in strategic sourcing savings across $28M spend through competitive bidding
- On-time delivery recovered to 97% — from below 50% at baseline
- Indirect material costs reduced by 67% ($44K/month savings), from $65,800 to $21,700 per month
- Delivered 97 units to clear the entire military backlog to zero
- All 3 DCMA government quality representatives departed the facility after observing the transformation
- Scorecard metrics established across 4 sites for the first time in company history
“Three government quality auditors had been living in our facility because of chronic late deliveries. After the supply chain overhaul, they walked into my office, asked what had changed, and left — they never came back. We went from 50% to 97% on-time delivery.”
Facing something similar?
More Client Results
OEM Machinery Kanban Transformation
Facility-wide Kanban, PFEP across 43,000 SKUs, and RFID pull systems took a $88M-spend OEM from daily line shutdowns to under 10 shortages and 25 inventory turns.
Read the case study OEM Heavy Machinery — Pacific Northwest to Southeast USCross-Country Product Line Relocation
A 3P stage-gate relocation resourced 7,900 components to a new Southeast supply base in 5 months while keeping current production running and launching 3 new products.
Read the case study Tier 1 Automotive (TS16949) — Midwest USTier 1 Automotive Inventory Recovery
Facility-wide Kanban, first-time cycle counting, and a logistics redesign recovered $13.8M in inventory for a Tier 1 automotive plastics manufacturer while sustaining 100% OTD.
Read the case studyTell Us What’s Going On
Every engagement starts with a conversation, not a sales pitch. Describe your situation and a senior advisor will respond — or request a quote scoped to your needs.
Request a Quote